Gemstone Production Records, Recovery Calculations and Operating Costs | Level 2 Lesson 9
Level 2 · Lesson 9
Complete Gemstone Mining and Extraction Learning Program
Suggested study: 60–90 minutes, including the exercise.
Go to exercise · Go to quiz · Continue learning
In this lesson — open the contents
- At a glance: Choose the right denominator
- Learning outcomes
- 2.9.1 Record material and time consistently
- 2.9.2 Recovered grade
- 2.9.3 Recovery efficiency and mass yield
- 2.9.4 Weighted results and balances
- 2.9.5 Throughput and downtime
- 2.9.6 Costs and interpretation
- Illustrated learning guide
- Practical learning exercise
- Review points
- Lesson summary
- Practice quiz: 10 MCQs
- Assignment
- References and further reading
Good production records turn observations into useful indicators. Each indicator needs a clear numerator, denominator, unit and time period. Similar-looking percentages can mean very different things.
At a glance: Choose the right denominator
Key idea: Every performance number needs units, a defined basis and a statement of exclusions.
Learning outcomes
- Convert grams, carats, kilograms and tonnes.
- Calculate recovered grade, mass yield and controlled recovery.
- Use weighted totals correctly.
- Interpret throughput and costs without promising profitability.
2.9.1 Record material and time consistently
A daily record should identify date, work area, material batch, feed quantity, processed quantity, recovered targets, rejects, useful output, downtime and measurement method. Use dry or wet mass consistently and state the basis. Volume requires a suitable density basis before conversion to mass.
One metric tonne is 1,000 kg; one kg is 1,000 g; one carat is 0.2 g. Therefore 10 ct is 2 g. Check that a balance and its precision are suitable for the actual task. Excessive decimal places do not create accuracy.
2.9.2 Recovered grade
Recovered grade is target output divided by the amount of feed processed, on a stated basis. A fictional sample yielding 12 ct from 60 kg has recovered grade 12 ÷ 60 = 0.20 ct/kg, equivalent to 200 ct/t.
This describes those tests under those conditions. It is not automatically an in-situ grade, a representative deposit grade or a reserve. It includes the effects of the recovery method and any losses in that trial.
2.9.3 Recovery efficiency and mass yield
Recovery compares recovered target material with the target originally present or independently estimated. In a controlled exercise, 18 ct recovered from a known starting 24 ct is 75% recovery by target mass. The independent starting amount is essential.
Mass yield compares a specified product mass with feed mass. If 2 kg of concentrate comes from 100 kg of feed, concentrate mass yield is 2%. That does not mean 2% gemstone recovery. The concentrate may contain non-target material.
2.9.4 Weighted results and balances
Sample A produces 5 ct from 20 kg, while B produces 3 ct from 60 kg. Combined recovered grade is total output divided by total feed: 8 ÷ 80 = 0.10 ct/kg. The unweighted average of 0.25 and 0.05 is 0.15 ct/kg and is wrong for the combined feed.
A mass balance accounts for all measured streams on compatible bases. For a dry teaching example, 100 kg feed equals 2 kg concentrate plus 97 kg rejects plus 1 kg unaccounted. The discrepancy is 1%; investigate weighing, retained material and handling losses rather than assuming its cause.
2.9.5 Throughput and downtime
Distinguish scheduled hours from operating hours. If 12 tonnes are processed during 6 actual operating hours within an 8-hour shift, operating throughput is 2 t/h. Average output over the scheduled shift is 1.5 t/h. Both can be valid when labelled correctly.
Operating-time fraction in this simplified record is 6 ÷ 8 = 75%. Formal availability and utilization definitions can differ between organizations, so define the terms before comparison. Do not multiply inconsistent indicators and call the result a standard performance measure.
2.9.6 Costs and interpretation
If the fictional shift has recorded operating costs of PKR 90,000 and produces 30 saleable carats, the recorded operating cost is PKR 3,000 per saleable carat. State what is included and excluded. This is not necessarily a fully loaded cost.
Revenue depends on quality distribution, actual selling prices, fees and sale conditions. Unsold stock is not cash revenue. A low cost per carat does not prove profit, and a few valuable stones can make a short period unrepresentative. Use scenario analysis and transparent records.
Illustrated learning guide
What quantity and measurement basis?
Target, concentrate or saleable product?
Operating hours or scheduled hours?
Formula, units, limitations and decision.
Always name the numerator and denominator. The same dataset can support several different, correctly labelled indicators.
Practical learning exercise
Recalculate each worked example independently with a calculator. Make a table containing formula, substituted numbers, answer, unit and one interpretation limit. Use only the fictional datasets supplied.
Review points
- Separate observations, assumptions and interpretations.
- State units, method, sample context and limits before using a result.
- Field and equipment competence require suitable supervised assessment.
Lesson summary
Recovered grade, recovery efficiency and mass yield differ. Combine unequal samples with weighted totals. Define time and cost boundaries, investigate discrepancies and separate indicators from profit claims.
Practice quiz: 10 MCQs
Select one answer for each question and press “Check my answers.” This self-check collects no name or email and does not verify professional competence.
Answer key and explanations
- B. 10 × 0.2 g = 2 g.
- C. 12 ÷ 60 = 0.20 ct/kg.
- D. Multiply by 1,000 kg per tonne.
- A. 18 ÷ 24 × 100 = 75%.
- B. This ratio compares concentrate mass with feed mass.
- C. (5 + 3) ÷ (20 + 60) = 0.10 ct/kg.
- D. 12 ÷ 6 = 2 t per operating hour.
- A. 12 ÷ 8 = 1.5 t per scheduled hour.
- B. 90,000 ÷ 30 = 3,000 per saleable carat.
- C. Revenue, other costs and uncertainty must also be assessed.
Assignment
Prepare a one-shift production sheet with compatible quantities, a balance, operating and shift throughput, recovered grade and recorded cost per saleable carat. Include one uncertainty and one check for each indicator.
References and further reading
- CIM, Mineral Exploration Best Practice Guidelines (2018)
- GIA, Gems Recovered from Sedimentary Rocks (2023)
- CRIRSCO, International Reporting Template (2024)
Sources provide subject background. Cases, numbers, exercises and illustrated guides are course-created teaching material unless stated otherwise. International guidance is not a substitute for current local requirements, manufacturer instructions or professional design.